Opened out of scrolling elements, added some local hobby radio info pull.
https://svonberg.org/wp-content/uploads/2026/09/weather-003.html




Opened out of scrolling elements, added some local hobby radio info pull.
https://svonberg.org/wp-content/uploads/2026/09/weather-003.html





I was cleaning out my garage and found some funko pops that I do not remember getting as gifts and would not have bought for myself. (I have a few I *have* received as gifts: a Universal Monsters, a Swamp Thing, Man-Thing, Green Sleestak and Enik, Groundhog and Phil from Groundhog Day, a Fallout Vault Dweller, and a Bigfoot.) Lord help me, all have been given by sweet people whom I care about, so they shall live in beady-eyed eternity in assorted places around the workshop.
The weird ones that seem to have magically formed are the Ecto-1 and Slimer, a Dragon Ball Z character, Skeletor, and a tiny Iron Man keychain. I have since donated those to a local charity shop and wish them good luck in finding a good home, avoiding a semi-eternity in a landfill.

Early voting is open in Roanoke County, and I got the sticker to prove it.
You can vote early in person now through Saturday, October 31. Two locations: the Elections Office in Vinton (900 Chestnut St) and the Brambleton Center satellite office (3738 Brambleton Ave). Hours are weekdays 8 AM to 4 PM, plus select weekend hours. No excuse needed. Just bring an ID.
Make a plan, bring a friend.
Details are on the Roanoke County Absentee and Early Voting page.
#roanokeva #roanoke #roanokecounty #vote #earlyvoting
First time getting McDonald’s fries in a long while. Over $5 for a large fries???
Inside Roanoke City (11.8% Total Tax)
Base price: $4.50.
Added taxes: $0.53.
Final total: $5.03.
Our tax dollars are paying for partisan political ads. This is dictator shit.
You can feel it turning now; the light comes in lower, the mornings have an edge, and the crickets sound like they’re running out of things to say.
Fall doesn’t hit the valley all at once; it leaks in through the edges: a yellow leaf here, a cold porch rail there.
I’m ready for it.
Give me the cool air, the foggy mornings, the ridge going gold. Bring it on.
What’s the first sign of fall you always notice, dear journal?


While one can technically create new stories using the 1960 (Bert Freed) public domain version of Columbo, one cannot use elements introduced in later iterations. Legal precedents like the Sherlock Holmes copyright cases dictate that only the traits established in the expired work are free to use. The iconic traits popularized by Peter Falk in the 1971 NBC series such as his specific portrayal, catchphrases like “just one more thing,” mentions of his unseen wife, and specific later episode plots remain heavily protected under active copyrights owned by Universal. The Peter Falk era episodes will not begin entering the public domain until 2067.
Getting cooler. Time to activate more pylons
https://www.instagram.com/reel/DCvEJv_ozP8/?igsh=MTd4M2xoYjFrYjkwag==
Discovered an adorable tribute to M.U.L.E. in pico-8 ! Just the opening, but still.

Reminds me that it’s Kevin’s birthday today! Glad I got that present shipped!
Its getting tougher to pick out goodies for folks these days… how many Big Trouble in Little China shirts or Xenomorph bottle openers can one guy stand?
Possum and Raccoon Visit
#backyardzoo
For the palma pro, playing with open meteo api for data
Might port it to other eink devices, like the xteink 4, maybe?
https://svonberg.org/wp-content/uploads/2026/09/monoweather.html

Kolchak: The Night Stalker – Episode 1: The Ripper
Kolchak: The Night Stalker – Episode 2: The Zombie
We started watching the first few episodes of Kolchak: The Night Stalker tonight, and it is every bit as fun as I remembered. Darren McGavin is absolutely magnetic as Carl Kolchak, stumping around in that rumpled suit and straw hat, cassette recorder in hand, trying to convince his furious boss that actual monsters are roaming around. (There are several bits of the “old man” from A Christmas Story fling out in moments of his frustration, too)
This seeded every monster of the week show that came after (for good or bad). It makes for fantastic seasonal filler as we start winding our way toward Halloween.

Day 20,052 – 570721052638
I took the CR-V in this morning to get it ready for the DC trip next week: AC check, a general roadworthy once-over, and getting the headlights redone. There is something satisfying about clear headlights before a long drive.
BHK is heading up for work. There might be an extra day tacked on to help the craft gang; we’ll see if that survives contact with the calendar.
Tomorrow the WVRIFA carousel goes live at noon. October 16, 10:00 AM, Roanoke Regional Partnership. The Wood Haven sale is not final yet, so this is the one to show up for.
Roanoke Wood Haven Technology Park being evaluated for data center, Authority says
what is happening
two data center fights are running in the roanoke valley right now. one is wood haven, the roughly 94 acre technology park in roanoke county owned by the western virginia regional industrial facility authority (wvirfa). the other is google’s proposed data center campus at the greenfield site in daleville, botetourt county. they are separate sites, separate deals, and separate boards, but the same questions follow both: water, power, transparency, and who gets a say.
the latest on wood haven
on september 11, 2026, wvrifa entered a purchase agreement for wood haven with clearview dynamics llc. the deal is not yet final. here is the timeline, as reported by local blog the scotto grotto from public records:
2023: wvrifa hires prologis to market wood haven for data center development. potential customers named in public records include meta, google, amazon/aws, microsoft, and nvidia.
2025: prologis pursues project dcroa, a proposed 300 megawatt, five building data center campus for a confidential tenant.
january 13, 2026: clearview dynamics llc is formed in delaware.
april 1, 2026: wvrifa terminates the prologis agreement after required conditions are not met.
may 2026: clearview registers in virginia.
september 11, 2026: wvrifa enters a purchase agreement with clearview for wood haven.
source: the scotto grotto, september 18 2026
https://svonberg.org/2026/09/18/day-21048-570716135430/
the other front: botetourt county
google wants to build what the army corps of engineers calls a “mission critical data center campus,” known as project raspberry, at greenfield in daleville. per the sierra club roanoke group’s july 2026 update: three data center buildings of about 300,000 square feet each, three substations, a 28,000 square foot office building, plus roads, utilities, and parking. google has indicated a need of 2 to 8 million gallons of water a day for cooling. the 79 megawatts from rocky forge wind would not be enough, so the campus would draw power from the grid.
source: sierra club virginia chapter, roanoke group
https://www.sierraclub.org/virginia/roanoke/data-center-impacts-virginia
where people have shown up
in june 2026, google hosted a community open house at lord botetourt high school. hundreds of residents packed in to question google officials and county staff about water, electric infrastructure, jobs, and long term impacts. outside, protesters lined the roadway with signs and chants. many said residents were not adequately involved in early discussions. one protester, chloe johnson, called it “a google unfair because this all feels very unfair.”
source: wsls 10, june 2026
https://gmg-wsls-prod.cdn.arcpublishing.com/news/local/2026/06/17/google-data-center-open-hose/
earlier, botetourt residents protested the project over water usage, noise, energy bills, and property values. video:
https://www.youtube.com/watch?v=rpgtvyBamLE
where to show up next
wvrifa board meetings are open to the public. they are normally held the third friday of each month at 10:00 am at the roanoke regional partnership, 111 franklin rd se, suite 333, roanoke. the next one falls on october 16, 2026. check wvrifa.org/meetings before going, because meetings are sometimes cancelled.
https://wvrifa.org/meetings/
roanoke city council and the roanoke county board of supervisors also hold public comment periods at their regular meetings. agendas are posted on the city and county websites.
who to call
every number below is public, listed by the government body itself, and was verified in september 2026. if you call about wood haven, the wvrifa board and your county supervisor are the ones with votes. if you call about the google campus, that is botetourt county.
roanoke city council
mayor joseph l. cobb: 540-853-2444, joseph.cobb@roanokeva.gov
vice mayor s. terry mcguire: 540-759-0621, terry.mcguire@roanokeva.gov
nicolas s. hagen: 540-759-1806, nick.hagen@roanokeva.gov
phazhon t. nash: 540-589-8329, phazhon.nash@roanokeva.gov
vivian sanchez-jones: 540-580-5637, vivian.sanchezjones@roanokeva.gov
peter j. volosin: 540-312-7572, peter.volosin@roanokeva.gov
evelyn w. powers: 540-524-0638, evelyn.w.powers@roanokeva.gov
roanoke county board of supervisors
the county publishes one public line and email for the whole board: 540-772-2005, bos@roanokecountyva.gov
david radford, windsor hills
martha b. hooker, catawba
tammy shepherd, vinton
phil north, hollins
paul m. mahoney, cave spring
wvrifa board of directors
the authority’s public contact: 540-343-4417, info@wvrifa.org
gary larrowe, botetourt county (chair)
kyle rosner, botetourt county
valmarie h. turner, city of roanoke
steve sandy, franklin county
danielle “dani” poe, franklin county
thomas j. miller, city of salem
chris dorsey, city of salem
richard caywood, roanoke county (vice chair)
megan baker, roanoke county
cody sexton, town of vinton
richard “pete” peters, town of vinton (secretary/treasurer)
the city of roanoke’s second wvrifa seat is currently vacant.
why this matters now
the wood haven sale is not final, which means the terms, the buyer, and the future of the site are still in play. the google campus in botetourt is still moving through public process. both will be decided by people whose phone numbers are listed above. showing up and calling are the two levers that work before a vote, not after.






your roanoke reps, all in one place.
public phones and emails for roanoke city council, the roanoke county board of supervisors, and the wvrifa board of directors. every number verified sept 2026 against official government pages.
save this for the next vote that matters.
#roanokeva #roanokecity #roanokecounty #wvrifa #woodhaven #localgovernment #civicengagement #virginia #knowyourreps
Pamela Gregorski
↓
Corporation Service Company (CSC)
↓
Clearview Dynamics LLC
↓
Wood Haven Technology Park
Other Gregorski-linked LLCs
Atmoss LLC → Oklahoma data-center project
Orla LLC → Indiana data-center project
Laidley LLC → Louisiana data-center project
Goat Systems LLC → Wyoming data-center project
Cambrin LLC → Wisconsin data-center project
Several of these projects have subsequently been publicly associated with Meta.
This pattern does not establish that Clearview is owned by Meta. It does show why Clearview’s corporate records and transaction documents warrant closer examination.
THE CLEARVIEW CONNECTION MAP
THE CENTRAL THREAD
PAMELA GREGORSKI
↓
Signed Clearview’s Virginia registration paperwork
↓
CLEARVIEW DYNAMICS LLC
↓
Purchase agreement with WVRIFA
↓
WOOD HAVEN TECHNOLOGY PARK
THE SITE’S EARLIER DEVELOPMENT THREAD
WOOD HAVEN TECHNOLOGY PARK
↓
WVRIFA hires Prologis to market the site
↓
PROJECT DCROA
↓
Proposed 300-MW, five-building data-center campus
↓
Tenant not publicly identified
THE UNPROVEN CONNECTION
CLEARVIEW
↓
?
↓
PROJECT DCROA / FORMER PROLOGIS TENANT
No public record currently establishes that these are the same project or that Clearview is the former tenant.
THE OTHER GREGORSKI-LINKED ENTITIES
GREGORSKI
↓
ATMOSS LLC → Oklahoma data-center project
GREGORSKI
↓
ORLA LLC → Indiana data-center project
GREGORSKI
↓
LAIDLEY LLC → Louisiana data-center project
GREGORSKI
↓
GOAT SYSTEMS LLC → Wyoming data-center project
GREGORSKI
↓
CAMBRIN LLC → Wisconsin data-center project
THE QUESTION
Does Clearview fit the same corporate pattern—or is the apparent connection coincidental?
The Clearview purchase agreement, financing records, ownership information and assignment provisions could provide the missing link.